CubicWheels offer holistic flange management solutions for clients in upstream and downstream sectors of the Oil & Gas industry during entire project life cycle, e.g construction; integration, commissioning & start-ups; and shutdowns & turnarounds.
Our Services
- Engineering analysis
- Unbolting
- Inspection
- In-situ machining
- Joint assembly & gasket installation
- Controlled bolting & bolt load assurance
- Joint integrity testing - pressure / leak testing
- Documentation, traceability & tagging
- Flange management system & software
- Project management
- Mechanical joint integrity consultancy
- Third party inspection & supervision
- ECITB, UK approved Mechanical Joint Integrity training (MJI10, MJI18 & MJI19) in Singapore
- Sales and rental of flange management tools
Our services conform to ASME Guidelines for Pressure Boundary Bolted Flange Joint Assembly - ASME PCC-1-2013 and other recognised standards and best industry practices.
Our key personnel are trained and certified to ECITB, UK Mechanical Joint Integrity competency requirements.